Video Library

The format for the video titles & library search is Stage: Trade: Task.

You will know the Stage the build is at & the Trade that is required on-site, so start with this to unlock the task where the installation detail really matters

Frame & Lock-Up Stage: Carpentry: Drip Lips for CFC Substrate Balconies

Who is installing the drip-break? Install the drip-break to the substrate before you even fix-off the sheets!

Frame & Lock-Up Stage: Carpentry: Treated Pine

Understand treated pine classifications and where to use them.

Frame & Lock-Up Stage: General Trades: Flashing Openings for Brick Veneer

Understand installation detail of wall wrap & flashings around wall openings

Frame or Lock-Up Stage: Carpentry: Parapet Capping Substrate

Installation substrate detail so that parapet capping drains back into the internal gutter system.

Frame or Lock-Up Stage: Carpentry: Wall Wrap & Flashing Openings

Wall wrap and flashing detail to keep buildings with timber & composite cladding watertight around wall openings.

Frame or Lock-Up Stage: Carpentry: Wall Wrap to Shed Water

Understand the importance of wall wrap and the installation thresholds.

Frame or Lock-Up Stage: Window Technician: Wall Wrap to Shed Water

Understand the importance of wall wrap and the installation thresholds.

Frame or Lock-Up: Carpentry: Packing Window & Door Sills

Best practice methods to avoid sill roll and window & door distortion.

Frame or Lock-Up: Window Technician: Packing Window & Door Sills

Best practice methods to avoid sill roll and window & door distortion.

Frame Stage: Framing: Box Gutters

Installation detail from the plumbing code that framers need to know about box gutters.