Frame Stage: Framing: Gutter Sumps (High Capacity)

Installation detail from the plumbing code that framers need to know about high-capacity min 600mm box gutter sumps.

Frame Stage: Framing: Gutter Sumps (Standard)

Installation detail from the plumbing code that framers need to know about standard 400mm box gutter sumps.

Frame Stage: Framing: Particleboard

Installation detail on particleboard substrate (such as Yellow-Tongue) which actually has it's own Australian Standard.

Lock-Up & Fix Stage: Bricklaying: Cleaning

Understand best practice methods and tolerances for masonry cleaning.

Lock-Up & Fix Stage: Carpentry: Sumps for CFC Balcony Substrates

You can now install sumps to CFC lightweight balcony systems, but the detail is critical.

Lock-Up & Fix Stage: External Waterproofing: Drip Lips for CFC Substrate Balconies

Critical installation detail for redirecting balcony & terrace surface water into a lineal gutter system.

Lock-Up & Fix Stage: General Trades: External Fixings

Understand external fixings and when they are required.

Lock-Up & Fix Stage: General Trades: External Fixings for Timber Cladding

Understand external fixing installation detail for timber cladding and what defines breaking surf locations.

Lock-Up & Fix Stage: Plumbing: Strip Drains

Installation detail of strip drains to keep you defect free.

Lock-Up & Fix Stage: Plumbing: Sumps for CFC Balcony Substrates

Detail on rebating the puddle flange into the CFC substrate.