Video Library

The format for the video titles & library search is Stage: Trade: Task.

You will know the Stage the build is at & the Trade that is required on-site, so start with this to unlock the task where the installation detail really matters

Lock-Up Stage: Plumbing: Puddle Flanges

Precise installation detail for superior puddle flange performance.

Lock-Up Stage: Rendering: Control Joints

Rendering detail when control joints are present on external walls.

Lock-Up Stage: Roof Plumbing: Downpipe Spreaders Water Discharge

Installation detail for defect free downpipe spreaders!

Lock-Up Stage: Roof Plumbing: Eave Gutters

Installation detail on external gutter profiles.

Lock-Up Stage: Roof Plumbing: Rainheads

Rainhead supply & installation detail.

Lock-Up Stage: Roof Plumbing: Sealing Corrugated Roofing Laps Adjacent Downpipe Spreaders

Sealing corrugated iron laps 1800mm either side of downpipe spreaders.

Lock-Up Stage: Roof Tiling: Anti Ponding Board

Installation detail on when and why to install anti-ponding board.

Lock-Up Stage: Roof Tiling: Flashings

Installation flashing detail and tile cover for tiled roof systems.

Lock-Up Stage: Roof Tiling: Sarking

Installation detail at the gutter end for standard sarking

Lock-Up Stage: Roof Tiling: Sarking Adjacent Downpipe Spreaders

Sarking detail to lower tiled roofs when downpipe spreaders are present.