Video Library

The format for the video titles & library search is Stage: Trade: Task.

You will know the Stage the build is at & the Trade that is required on-site, so start with this to unlock the task where the installation detail really matters

Lock-Up Stage: Carpentry: Lightweight Cladding

Timber, Cement Sheet, & Composite Board installation tips & mandatory requirements.

Lock-Up Stage: Cladding: Drip Breaks

So often missed, drip breaks are the answer to shedding water from a buildings facade.

Lock-Up Stage: Electrical & HVAC: Ducting to Atmosphere

During the rough-in stage, understand when you must duct appliances, fixtures and fittings to the exterior of the building.

Lock-Up Stage: General Trades: Sealing Windows & Doors

Understand what is required to weatherproof wall openings and seal buildings from an energy consumption perspective.

Lock-Up Stage: General Trades: Wall Wrap to Parapets

Did you know that wall wrap must extend all the over the top plate of the parapet and terminate in the box gutter?

Lock-Up Stage: HVAC Technician: Condensate Drains

Understand the code when it comes to installing spit systems and evaporative coolers.

Lock-Up Stage: Metal Roof Plumbing: Box Gutters

Installation detail and a plotting chart to get box gutters right first time every time.

Lock-Up Stage: Metal Roof Plumbing: Deck Profile Turn-Downs

Detail on drip breaks for metal deck roofing.

Lock-Up Stage: Metal Roof Plumbing: Gutter Sumps (High Capacity)

The minimum high-capacity sump length is 600mm.

Lock-Up Stage: Metal Roof Plumbing: Gutter Sumps (Standard)

The minimum sump length is 400mm.